Building pad finish and backfill in Silex
Before and after
What we did in Silex, MO
Putting some finishing touches on a building pad. After the building was put in we made the pad right. Backfilling the inside with rock compacting it making the rock firm snd tight.
How a job like this goes
Every job on this site runs the same way, whether it's an afternoon of grading or a week of clearing. I come look at the ground myself and give you a straight bid — real numbers, not a range that doubles once the machine shows up. Then I do the work personally: right machine for the lot, grade checked as I go, and the site left clean enough that you'd never know equipment was there — except the problem's gone. You can read exactly how I approach building pad and site prep work, what drives the price, and what I check first on a property like this one.
Two things I won't do: guess at a bid over the phone without seeing the ground, and walk away from a job half-finished because it turned out harder than the photo made it look. Dirt work punishes shortcuts — a grade that's off by an inch or a drain with no fall shows up again the first hard rain. Doing it right the first time is cheaper than doing it twice, and that's the standard every job in this gallery was held to.
If your place has the same problem you see in the "before" photo, tell me what's going on — or browse the full before-and-after gallery to find the job that looks most like yours.
Want yours to look like the "after"?
Tell me what's going on and I'll come bid it — usually this week. Every call gets answered, day or night.